Let there be light - Nov. 8, 2010 |
|

Photo credit : Carl Lepage |
|
|
The way in - Oct. 21, 2010 |
|

Photo credit : Carl Lepage |
|
Decorative stonework on the Booth street side - Sept 29, 2010 |
|

Photo credit: Carl Lepage |
|
There shall be heat - Sept. 21, 2010 |
|

Photo credit : Carl Lepage |
|
What went up, eventually must come down - Sept. 15, 2010 |
|
 
Photos by Gord Metcalfe |
|
Construction has progressed to the fourth floor - August 25, 2010. |
|

Credit: photo by Carl Lepage |
|
Construction Update - July 2, 2010 |
|

Photo taken by Gord Metcalfe; graphics by Carl Lepage |
|
Construction updates: June 11 to June 17, 2010 |
|
View from the crane; the cables are the in-floor heating. 
Credit: Photo by Carl Lepage This is what it takes to build a second floor. 
Credit: Photo by Carl Lepage The ground floor takes shape with the construction of the shear walls. Credit: Photo by Carl Lepage This sign makes it clear that we aren't building another condo. 
Credit: Photo by Carl Lepage |
|
Preparing the site: May 10, 2010 |
|
With the site now cleared of debris, the beginning of Cornerstone’s new facility became visible as the preparatory work continued; the red brick building in the background is on the west side of Booth street looking south. Credit: Photo by Gord Metcalfe A familiar installation on every construction site, the crane is up and visible from several blocks away. The grey building in the background is on Eccles Street, west of Booth Street. Credit: Photo by Gord Metcalfe These two photos show the progress being made on the foundation and basement area of the building. Over several days, 44 loads of concrete were poured to install the footings, the foundation walls, the sheer walls and finally the basement floor. Photo 1 shows the preparatory work necessary to get ready for the concrete to be poured; photo #2 shows the basement floor nearing completion. Credit: Photos by Gord Metcalfe |
|
|
|
|